Shelly EM PRO install

Hi, I am about to have my local electrician install (3) Shelly EM PROs in one of my electrical switch boards. I am looking at the install diagrams and beginning to wonder how easy it will be for them to install the energy metering clamps given the clearance (see photo). Also, I was planning of getting a Hager 10 Amp Three Pole 10kA Circuit Breaker for the EMs. There is room on the lower rack for all units.

Hard to imagine easier case.

1 Like

on one side of the breakers it has common bus bars, on the other very little clearance.

I only see lot of space.
Sometimes they are so full that you need two person to close the cover… :wink: