Hello everyone, I need some advice here is the whole thing. I have a 3 floor house, with tp link cable between them(XE75 pro-M9-M9), and then a bunch of miniR3 with bridge hub(3), and some philips hue lights on the bridge of philips. The plan is to move to zigbee all, been trying with Zha and ZBT1.
I’d like to remove some hubs of sonoff bc lately ( I suppose for to many zigbee stuff, they have been working badly). What would you advice for coordinator Zha or another. And to remove the hubs?
Thanks!