I have 2 inverters and 1 I can control the grid export limit. I created an automation that if the total of both (I see on my P1 meter) I adjust my grid export to eg 500w. But the action doesn’t trigger. Any suggestions?
Suggestions it what might goes wrong or what I am do wrong.
Look at the automation trace as per the link I posted.
Sorry, didn’t know it was link to solution. I will check it, thanks
We also have no idea what the automation looks like.
1 Like